|
|
|
 |
| Gudang Economic & Technological Park Factory Building |
| Hangzhou Gudang Economic & Technological Park is located in the junction of Tianmushan Road and Gudun Road. It is approved by the Municipal construction Bureau and planning Bureau and operated by Gudang Subdistrict. It covers an area of 16.67 hectares with a factory building area of 130,000 m2 .(some still under construction). Acon biotech (Hangzhou) Co.,Ltd., Hangzhou keting Opting Optical Technology Co., Ltd., Hangzhou Digital Device Co., Ltd., Hangzhou Netcom Co., Ltd., etc., a dozen of high-tech companies have resided in. the park is easy to access with Gudun Road and Zijianghua Road going from north to south and Tianmushan Road and Wenyuan Road going from east to west. It has sound infrastructure and double-line dlectricity |
| |
Factory Building 1 |
The total construction area is 50,000m2 , made up by 2 buildings of 80,000m2 , and 2 buildings of 15,000m2 . The ground floors enjoy a height of 4.5 m, while others are 3.8 m, and every floor enjoys an area of 1300-2500 m2 . There are 2 goods elevators take a load of 2000 kg each for every building.
Cooperation Ways: For sale or for rent. |
|
| |
| Factory Building 2 |
The total construction area is 45,000m2 , made up by 2 buildings. Every floor enjoys a height of 4.5 m, and an area of 1200-1500 m2 . There are 2 goods elevators take a load of 2000 kg each for every building.
Cooperation Ways: For rent. |
|
| |
| Factory Building 3 |
he total construction area is 35,000m2. Every floor enjoys a height of 4.5 m, and an area of 3000 m2 . There are 2 goods elevators take a load of 2000 kg each for every building.
Cooperation Ways: For rent. |
|
| |
| West Lake Economic and Technological Park Factory Building |
| There are 300,000 m2 factory buildings ready for rent.Every floor enjoys a height of 4.2-4.5 m,and an area of 1000-2800 m2. They are strictly and precisely built,every pillar loads 350-400 tons ,and every building has 2 goods elevators. It’s specially fit for hi-tech industries, such as electronics,biochemical medicines. |
| Factory Building 1 |
The total construction area is 28,306 m2, made up by 3 buildings,and each building has four floors.Every floor enjoys an area of 2000 m2, and a height of 4.2m.There are 2 goods elevators take a load of 1500 kg each for every building.There are accessory office area and dining rooms. It is most suitable for the manufacture and assembly of electronic and electrical appliance.
Cooperation Ways:for rent. |
|
| Factory Building 2 |
The total construction area is 120,000 m2, made up by factory building, office building and dining building.
The factory building’s construction area is 90,000 m2, with 4 floors.Every floor enjoys a height of 4.5m,and an area of 1100-2000 m2. There are 2 goods elevators take a load of 2500 kg each for every building.It is most suitable for light and electronic industries.
Cooperation Ways:For rent. |
|
| Factory Building 3 |
The total construction area is 26.836 m2, made up by 4 factory buildings,and a multiple purposed building.
The factory buildings’ construction area is 21,120 m2. Building A1 and A2 has a construction area of 5,600 m2 each,building B1 and B2 has a construction area of 4,960 m2 each.There are resting rooms,locker rooms,toilets,offices,and 2 goods elevators take a load of 2000 kg each for every building. It is most suitable for the manufacture of electronic products.
The multiple purposed building’s construction area is 5,694 m2, with 6 floors.It s most suitable for manager’s office,sale’s office and R & D office.
Cooperation Ways:For rent. |
|
| Factory Building 4 |
The total construction area is 46,000 m2, made up by 4 factories building,and a multiple purposed building.
The factory buildings’ construction area is 37,000 m2. Every floor enjoys a height of 4.5m,and an area of 1,900 m2. There are 2 goods elevators take a load of 2000 kg each for every building.
Cooperation Ways:for rent. |
| |
|
|
|
|
|